Specifications include, but are not limited to: 1 Mobilization (Not to exceed 6% of the total sum bid excluding bid price for this item, allowance, and allowable costs items.) 2 Clearing, including disposal of trees, shrubs, vegetation, rubbish and all other materials to be cleared 3 Rock Slope Scaling, including all labor and materials, disposal of and removal of loose or unstable rocks, soil, and debris 4 Rock Removal, including all labor and materials, disposal of unstable rocks indicated on the plans 5 Grouted Anchors, including all labor, materials and equipment, in place, complete. 6 Shotcrete, including steel reinforcement, fiber reinforcement, FRP dowels, stainless steel dowels, geocomposite drains, premolded joint filler, both structural and sculpted shotcrete material, all labor, equipment, in place, complete 7 Sculpting of Shotcrete Finish, including equipment and labor for applying a sculpted finish, as specified, installed complete