Specifications include, but are not limited to: Phase 1: Phase 1 will entail the construction of the proposed access driveway to the Lanxess parcel, an associated parking area, lighting and drainage improvements. The total project area of Phase 1 is approximately 3.5 acres. Phase 2A: Phase 2A will entail the construction of the approximately 900 LF of roadway with associated storm drainage and utilities (the through road) from the sewage treatment plant to be blended into the existing haul road that serves the plant along the eastern side of the property. It also includes the construction of approximately 1,240 LF of roadway (Building A Access Road) from the through road up to Building Pad A. It also includes the installation of approximately 2,500 LF of 60” storm drainage pipe from the Cherry Street drainage system that will run in the Building A Access Road and will be installed under the existing railroad tracks to its’ proposed outlet at the Naugatuck River. The total project area of Phase 2A is approximately 7.8 acres. Phase 2B: Phase 2B will entail the construction of the approximately 3,675 LF of roadway with associated storm drainage and utilities (the Through Road) from Phase 2A out to the roadway intersection with Ward Street & Elm Street. It also includes the installation of a 36” storm drainage pipe under the existing railroad tracks to its’ proposed outlet at the Naugatuck River. It also includes the installation of a second 36” storm drainage pipe under the existing railroad tracks that will be routed through an existing manway tunnel to its’ proposed outlet at the Naugatuck River. The total project area of Phase 2A is approximately 6.6 acres. Phase 3: Phase 3 will entail the mass earthwork associated with preparation of building pad sites D and E. These pad sites will be served by the access driveway that currently serves the Lanxess property, access to the Lanxess property will be replaced by the driveway proposed in Phase 1. It also includes associated utility installation that will be required in the driveway area that will tie into the utilities installed in the Through Road that are to be installed in Phase 2B. The total project area of Phase 3 is approximately 7.4 acres. Phase 4: Phase 4 will entail the mass earthwork associated with preparation of building pad sites A, B and C. These pad sites will be served by Cherry Street and by the Building A Access Road constructed in Phase 2A. The total project area of Phase 3 is approximately 9.3 acres. Phase 5: Phase 5 will entail the mass earthwork associated with preparation of building pad sites F and G. These pad sites will be served by the Through Road constructed in Phase 2B. The total project area of Phase 3 is approximately 6.7 acres. Phase 6: Phase 6 will entail the mass earthwork associated with preparation of a future building pad site for the port area, east of the railroad tracks, adjacent to the river. The total project area of Phase 6 is approximately 19.0 acres.