Specifications include, but are not limited to:The project scope of work includes the installation of air conditioning in three (3) 208 bed dormitories. In each dormitory, the work will include the installation of eight (8) constant volume air handling units with DX cooling coils and hot water heating coils, eight new outdoor air cooled condensing units, refrigerant piping, heating hot water piping, new ductwork and air distribution devices. Each existing dormitory will also be provided with a new direct digital control system for all new and existing equipment. Scope of work may also include adding air conditioning to one 28 bed segregation unit (Single Cell B) and the Auditorium/Gym. The scope of work in Single Cell B and the Auditorium/Gym will be bid as add alternates.