Specifications include, but are not limited to: San Francisco Public Utilities Commission (“SFPUC”) announces a Request for Qualifications and Proposals (“RFQ&P”) inviting California Class “B” General Building Contractors to submit their qualifications for evaluation and submit a Proposal simultaneously in response to this RFQ&P to perform pre-construction and construction services for Contract No. WW-750 –Southeast Water Pollution Control Plant SEP-7 Operations, Engineering, and Maintenance Buildings (“SEP-7” or “Project”), using the Construction Manager / General Contractor project delivery method. Interested parties responding to this RFQ&P (“Applicants” or “Proposers”) must be construction manager / general contractors (“CM/GCs”) capable of performing preconstruction services and building construction services. Work shall comply with all applicable codes and regulatory agencies’ standards having jurisdiction over the design, construction and operation of the Project. The Project, located at 1700 Jerrold Avenue, a property just under an acre, located at Jerrold Avenue and Phelps Street, will replace an existing facility (SEP 850) with two new buildings, Maintenance Mechanical (SEP 603) and Operations, Engineering and Maintenance (SEP 914). The work includes relocation of SEP 850 staff, facilities and utilities; demolition of the SEP 850 building, two existing trailers (SEP 850A and 850B) and an adjacent surface parking lot; and construction of the new buildings. The new buildings will provide shops for maintenance groups, offices for the engineering division and shower and locker facilities for the Plant. The Maintenance Mechanical building (SEP 603) will be one-story with a mezzanine, 35 feet high, and approximately 10,000 square feet of industrial shops space for SEP maintenance crews.