Specifications include, but are not limited to: 1. Trim all overgrowth -roof line : trim all dead, decaying, damaged and overgrown plants, shrubs and trees, to provide safety and an attractive appearance. Remove 50% of the tree limb length that overhangs any structure. Remove all debris and rake clean. CLEAR ROOF LINE. 2. Install a 3/4" CDX plywood access door in a 2"x4" preservative treated frame. provide galvanized iron hinges and hasp. INCLUDE LATCH AND LOCK. Dispose of existing steps. Construct a replacement stair unit with 2'x 12' preservative treated pine stringers, 5/4" PTP stepping stock treads, 1x PTP risers on a solid concrete footer. Frame stairs 3' wide REMOVE EXISTING CONCRETE STEPS. Remove and dispose of all roofing and defective sheathing. Synthetic felt and plastic cap fasteners. install ice and water shields in all valleys. Install preformed aluminum, drip edge and vent pipe boots. Install metal flashing around chimneys and metal wall flashing to prevent water intrusion, seal and caulk. Install a 220 lb fiberglass asphalt 3 tab shingle with a 25 year warranty.Replace all flashing pipe vents and install turbines. Labor will require 5 year warranty. Restore water service to structure. Identify defects and repair to bring structure into compliance with the current national and local plumbing code RE-PLUMB HOUSE TO MEET CODE.