Specifications include, but are not limited to: This project involves the removal of existing drinking fountains and the procurement and installation of new hydration stations at locations identified in Appendix A of the Contract Documents. The full scope of the Project and the work to be performed by Contractor is set forth in the Plans and Specifications prepared by the Architect which are a part of the Contract Documents, and the Contract will furnish all labor, materials, tools, equipment, and services necessary to complete the scope of work detailed therein. It is the Contractor’s responsibility to protect existing construction. In addition, daily removal of debris and repair of any damage due to work under this Contract is considered within the scope of work and is the responsibility of the Contractor. In general, all materials and equipment to be furnished by Contractor must be of good quality, new and unused, and shall be constructed and installed as required in the Contract Documents and of the types of equipment and materials as specified.