Specifications include, but are not limited to: providing the connection interface for out primary network fiber cabling already installed. The fiber optic connection will be installed to connect core switches located in the IDF's from the current press box to the new press box. Current fiber runs are in conduit between buildings. Total run length is approximately 3000'. Connection is set as SC type connector and the vendor will terminate 8 strands on both sides of the current fiber cable run. Contractor is encouraged to com on-site for walk through measurements. All associated labeling, testing, or terminating should be included in the quote. Contractor shall be responsible for supplying fiber optic mounting and fastening hardware throughout the distribution, and the installation of fiber can take place during normal (8:00 A.M. - 5:00 P.M. Monday - Friday), or after-hours. Final connectivity switchover should take place after normal hours. Conduits, Tubes, TDUs, fiber panels, and cables shall be labeled as per location cabling standard.