Specifications include, but are not limited to: new 400 gpm sewer lift station and parallel sewer force mains with provisions for future buildout to 1,500 gpm. Lift station work includes site grading, installation of precast concrete wet well and dry pit structures with depths of approx. 20-FT; three 15 horsepower sewage pumps and discharge piping; yard piping, valves, and fittings, a flow meter and air valve vault; pig launching stations; electrical and controls; and all associated appurtenances. Force main work includes over 11,500 LF each of 6-inch and 10-inch HDPE piping, air valve assemblies, a waterline relocation, and connections to the City’s existing gravity sewer system. The force main piping requires a trenchless crossing under SR-535 and open-cut construction within UPRR right-of-way.