Specifications include, but are not limited to: • Roadway: The project consists of a full reconstruction including drainage and ADA safety improvements of Rose Street between Central Avenue and Peach Street. The scope of work includes removal of existing asphalt surface and base course and replacement with new base course with geogrid and new 4-inch asphalt surface, curb and gutter, drainage inlets, sidewalk, ADA ramps with detectable warning surfaces, drive pads, utility valve adjustments, and sewer manhole cover adjustments, and striping. (Roadway Reconstruction: Approx 1,950 feet in length and varies between 21 feet to 42 feet wide) • Utilities: Includes installation of main gas line and gas services. Installation of transmission and distribution waterlines, new gate valves and water service lines, and additional new fire hydrants.