Specifications include, but are not limited to: 1.1 Strip all existing roof materials and insulation down to concrete deck. Remove large unused penetration stack and deck over opening in concrete deck. 1.2 Install 2 ply Tri Base Premium vapor barrier to deck in CAVR adhesive, Install 2 layers of 2.6" insulation and one layer Yz'' gyp board adhered in lnsulock HR per current ASCE wind uplift calculations. 1.3 Install 80 mil FlexBase E 80 SBS-mod membrane base sheet in 2-2.5 gallons per square modified Zero VOC cold process adhesive. 1.4 Install new 145 mil Optimax FR Mineral urethane modified bitumen roof membrane set in 2.5 gallons per square modified Zero VOC cold process adhesive. 1.5 Install new flashless .050 pre-manufactured aluminum raised metal edge10.25" fascia along entire perimeter with Kynar 500 finish. The metal edge will cover the entire surface of fascia, contractor responsible for proper coverage over 2X material. Provide alternate price to replace 2X10 material subfascia.