Specifications include, but are not limited to: The contractor shall provide tools, glue, tack strips, carpet, vinyl, padding, supervision, labor, and cleaning supplies needed to provide the services. Work quantity of this contract will vary. The typical minimum of two units can be expected, but not guaranteed. The Contractor shall be responsible for all damages to persons or property caused by either equipment or operator error. The Owner reserves the right to repair any damages with other sources if the Contractor fails to do so within a reasonable time of notice, and to repair and deduct the cost incurred from monies owed the contractor. CIHA will notify the contractor within 24 hours of any damages found. A. Removal and disposal (off site) of old carpet, vinyl, cove base and tack strip etc.as needed. In most cases CIHA maintenance staff will remove old carpet and pad from units. B. Stock a minimum of 200 square yards of carpet, and 60 square yards of vinyl for immediate use.48-hour response time once notified to proceed. C. Floor preparation as needed. D. Sub-floor replacement with 3/8" underlayment rated plywood, as needed. E. Moving and resetting appliances, as needed. F. Carpet stairs, as needed. G. Tack strips and incidentals, as needed. H. Removal and resetting toilets {including parts), as needed. I. The occasional request for materials not listed above. J. Clean project site and work areas when complete. K. The contractor shall, if directed by the designated CIHA representative, respond to the site within 24 hours of being notified that corrections need to be made.