Specifications include, but are not limited to: 1. Provide all labor, materials and equipment required to paint over all graffiti throughout four (4) sections located on sections of I-293, I-93 and NH 101. There are 111 locations in total that are varying in size. 2. Provide all labor, materials and equipment for ½ day (4 hours) with a minimum of a two (2) person crew required to painting over additional locations that are either added to the contract or areas that got re-graffitied located on sections of I-293, I-93 and NH 101. New locations will be requested through a work order and shall be completed within 1 week of submitting work order to contractor. Additional work locations will cover the same routes as section 1-4 with the possibly of going up to Exit 15 in Concord on I-93.