Specifications include, but are not limited to: 1. This job consists of 1.5” Cold Mill and 1.5” HMA Overlay. It includes Rock Edge Wedge and Pavement Marking. The job is located on K-9 from the K-99 north junction to the K-87 junction. 2. No lane closures or detours will be allowed overnight. 3. The Contractor is responsible for establishing and maintaining centerline of the traveled way for the duration of the project. Splitting the traveled way with a tape measure is an acceptable technique to establish centerline. This work is considered subsidiary to other items in the contract. 4. A minimum of one lane must be maintained open to traffic at all times through the work zone. All intersections are to remain open during construction. 5. The contractor shall be responsible for noting the location of all pavement markings prior to the work, and reinstalling these in the proper location after the overlay.