Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 020100 1.000 LS CONTRACTOR CONSTRUCTION STAKING / 2 025323 1.000 LS MOBILIZATION / 3 025324 1.000 LS TRAFFIC CONTROL / 4 070580 1.000 HOUR $70.000 $70.00 FLAGGER (SET PRICE) / Section 01 Total $70.00 Section 02 ROAD ITEMS 5 025361 1.000 LS CLEARING AND GRUBBING / 6 012410 540.000 CUYD COMMON EXCAVATION (RURAL SMALL) / 7 012415 185.000 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) / 8 012317 174.000 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) / 9 010114 1.000 MGAL $40.000 $40.00 WATER (GRADING) (SET PRICE) / 10 023456 3228.250 LNFT GUARDRAIL, STEEL PLATE (MGS) / 11 023449 4137.750 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE / 12 081050 971.000 TON PAVEMENT EDGE WEDGE (ROCK) / 13 013217 5151.000 SQYD SEPARATION GEOTEXTILE / 14 011478 1.000 MGAL $40.000 $40.00 WATER (EARTHWORK COMPACTION) (SET PRICE) / Section 02 Total $80.00 Section 03 AA1 GUARDRAIL END TERMINAL (MGS-FLEAT) ALT 15 030567 17.000 EACH GUARDRAIL END TERMINAL (MGS-FLEAT) / Section 03 Total