All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: THE PURPOSE OF THIS PROJECT IS TO PROVIDE GEOMETRIC IMPROVEMENTS, CONSTRUCTION OF A CENTER TURN LANE, SHOULDER WIDENING, AND POLYMER OVERLAY ON ONE BRIDGE ACROSS 1.292 MILES OF HIGHWAY 5 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF ITEMS, EARTHWORK, AGGREGATE BASE COURSE, ACHM BASE, BINDER, AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, PORTLAND CEMENT CONCRETE DRIVEWAY, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, EROSION CONTROL, CONCRETE ISLAND AND WALKS, CONCRETE CURB AND GUTTER, RUMBLE STRIPES, PAVEMENT MARKING, MODIFICATION OF EXISTING BRIDGE STRUCTURE, POLYMER OVERLAY, AND MISC. ITEMS.