Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207002-000 SUBGRADE CY 906.000 _________._____ _________._____ 0020 207034-000 FABRIC FOR SEPARATION SY 33,278.000 _________._____ _________._____ 0025 307001-000 AGGREGATE BASE COURSE, CLASS 3 CY 566.000 _________._____ _________._____ 0030 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 5,373.000 _________._____ _________._____ 0035 311006-001 OPEN GRADED FREE DRAINING BASE COURSE CY 917.000 _________._____ _________._____ 0040 408002-001 ASPHALT MATERIAL GA 516.000 _________._____ _________._____ 0045 410001-030 SUPERPAVE ASPHALT BASE CRSE, TY 19 SY 5,416.000 _________._____ _________._____ 0050 410007-060 SUPERPAVE ASPHALT SKID PVT, TY 12.5 SY 10,575.000 _________._____ _________._____ 0055 415005-001 STANDARD MILLING SY 5,159.000 _________._____ _________._____ 0060 601003-001 CLASS K CONCRETE CY 8.000 _________._____ _________._____0065 602002-001 EPOXY COATED REINFORCING STEEL BAR LB 392.000 _________._____ _________._____ 0070 606029-001 FREE DRAINING BASE TRENCH LF 44,006.000 _________._____ _________._____ 0075 606030-001 OUTLET PIPE, 6 IN LF 7,238.000 _________._____ _________._____ 0080 607001-001 TYPE 1 GUARDRAIL, CLASS I LF 22,466.000 _________._____ _________._____ 0085 607001-001 TYPE 1 GUARDRAIL, CLASS II LF 1,437.500 _________._____ _________._____ 0090 607001-001 TYPE 1 GUARDRAIL, CLASS V LF 525.000 _________._____ _________._____ 0095 607005-001 TYPE 5 GUARDRAIL, CLASS I LF 2,637.500 _________._____ _________._____ 0100 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION EA 18.000 _________._____ _________._____