Specifications include, but are not limited to: Seal all cracks ¼” or wider in all travel lanes, shoulders, and medians according to Section 00746 of the Standard Specifications at the locations listed below. Seal joints between asphalt pavement and gutter line where present. Furnish hot poured sealant Polyflex 547 (manufactured by Crafco Inc.) or an approved equivalent product that meets the requirements of Section 02440.30 of the Standard Specifications. General overview map and limits: I5 mainline and all on and off ramps from the OR58 off ramp to the willammette bridge. NB I5 MP 188.05 – MP 192.48 SB I5 MP 192.55 – MP 187.95 (Exact mile points can be found on ODOT TransGIS website. On the left side of the screen, make sure you’re on the layer tab, click Road Network > Highway Mile Point – Hundredths > Submit Then zoom in to the area of interst to see the mile points. You can change to an aerial background by navigating to the Basemaps tab > ODOT Aerial Hybrid.)