Specifications include, but are not limited to: 3.1.1 Develop a Feasibility Study identifying Program Verification, Conceptional Development, Preliminary Architectural Design, and Construction Administration Services and confirming the size of the facility, location of the new Circuit Court should be sited (onsite) site design, architectural design (number of rooms, size, restrooms, storage, etc.) and proposed construction costs. Said study shall also examine required parking needs and design. 3.1.2 Cite possible funding sources, and, identify if the Proposer can write grants to secure the funding necessary for development, and at what cost. 3.1.3 The Proposer shall provide six (6) hard copies of the Proposal. 3.1.4 Proposer shall be responsible for meeting all deadlines agreed upon in the contract.