Specifications include, but are not limited to: The contractor will be responsible for five sites: Three on South Washington Road and two on Edwards Road South Washington Road: Site 1: First Site north of Intersection with Upper Village road - 120 ft of road 12 ft wide. Replace culvert and repair Roadway slope. Town of Chelsea to provide culvert. Excavation of approximately 213 CY of material to be replaced with similar amount of Stone Fill Type IV. Site 2: Second site north of Upper Village Road – 60 ft of road 10 ft wide. Repair slope at brook. Steep embankment will require stone toe wall. Excavate approximately 89 CY of material and replace with similar amount of Stone Fill type IV Site 3: “Farthest East to Taylor Farm.” Replace culvert add stone at inlet and outlet. Town to Supply Culvert. With require approx. 30CY Stone Fill Type IV Edwards Road: Site 1: Repair 25ft of slope on lower end of Edwards Road, west of Gilman’s Hill. Excavate approx. 9 CY of material and replace with similar amount of Stone Fill, Type II Site 2: Also West of Gilman’s Hill 60 ft of slope 20 ft wide. Excavate approx. 89 CY of material and replace with similar amount of Stone Fill, Type IV