Specifications include, but are not limited to: 1. The contractor must remove the existing roof system including any decking, coping, scuppers, downspouts, that has been damaged beyond repair. 2. The contractor is responsible for all dump fees and cost for removal. 3. The contractor must install a minimum of 3” roofing insulation board over the decking. 4. The contractor must install a fully adhered 60 mil TPO roofing system. 5. The contractor must install new decking, coping, downspouts etc. that were removed in earlier stages. 6. The contractor is required to engage in one preconstruction meeting with the City of Dodge City and any subcontractors involved. 7. If the current insulation is in good shape and can be reused the bid must be altered to show the reduction in material and labor costs. 8. The Contractor must provide a minimum of 20 yr Material warranty from the contractor or by the manufacturer. 9. The contractor must provide a 3-year Labor warranty at minimum. 10. Hours of operation must be approved by the Dodge City Development Services Department.