Specifications include, but are not limited to: 1.Project involves the application of new interior finishes to walls, stairs, walking surfaces and ceilings in the area occupied by the central stair at the south of Freedom Hall. This stair connects the south concourse space to the arena floor below. 2.In addition to new interior finishes in these locations, defining dedicated storage areas to either side of the stair at the arena level with sliding door access as well as fascia treatment to the existing bleacher assembly above the stair is included. 3.Removal of the existing wall-mounted handrails will be required. Re-installation or replacement is needed as indicated in the drawings. 4.New interior finish materials have been chosen for their respective levels of abuse-resistance. 5.A priority (as listed in the Substantial Completion requirements) is the interior finishes, electrical and data infrastructure and installation of new digital monitors on the north wall at the concourse level. 6.A large wall will become exposed by the scheduled demolition of the existing ceiling in the stairwell at the north end of the space. This wall will receive a new GWB treatment and have a digital monitor installed. 7.Swinging doors will be provided at the top entrance point of the stairs to provide security for KEC/Freedom Hall and shall be installed to rest flush with the concourse walls when in the "open"position.