Specifications include, but are not limited to: The Project is being bid with three alternates: · Alternate A includes work from Center Street to 300 East · Alternate B includes work from 100 West to 300 East Alternate C includes work from 600 West to 300 East There will be a water line additive matching the extents of each alternate, except it will extend to 400 East. The alternates include the approximate quantities listed below for major items of work. Alternate A: Center 300 E Alternate B: 100 W 300 E Alternate C: 600 W 300 E Curb & Gutter (LF) 3,900 5,200 9,800 Concrete Work (SF) 35,000 50,000 98,000 Untreated Base Course (Tons) 9.700 12,500 21,000 HMA & SMA (Tons) 7,500 9,300 18,000 RCP, 18” – 24” (LF) 1,200 1,600 3,000 PVC Conduit, 2” – 6” (LF) 6,100 9,000 17,500 Street Lights (EA) 13 19 46 Street Trees, with irrigation (EA) 23 32 47 Traffic Signal System (EA) 1 1 1 PVC Water Line Additive, 6” & 8” (LF) 2,500 3,100 6,500 The project will also include restoration of properties adjacent to the street widening, traffic control, construction staking, asphalt profile milling, pulverizing asphalt, roadway excavation, removal of concrete curb & gutter and concrete flatwork, installing storm water infiltration galleries, replacing overhead power meter cabinets with underground power meter cabinets, as well as other items of work incidental to this type of project.