Specifications include, but are not limited to: A. Contractor shall remove existing roofing material including shingles, coated foam, builtup roofing, and felt down to existing roof sheathing. 1. Plants, trees, and landscape around the house shall be covered and protected as required to maintain the original condition. 2. Contractor shall make the facility roof completely watertight at the end of each day to protect against interior water damage. B. Contractor shall replace damaged sheathing, fascia board, freeze board, and any other structural features as requested by the department. Damage exposed after removal of the roofing material will first be inspected by the assigned Project Coordinator, or authorized delegate. Necessary repairs will be agreed upon and performed by the Contractor at the bid unit price. C. Install new underlayment or fiberglass shingles. D. Install all new bondarized drip edges, flashing, collars, and roof jacks to render the roof installation complete and watertight. E. See 3.12 Specifications for more details. F. A Project Coordinator will be assigned by the Housing Department for each job.