Specifications include, but are not limited to: • The proposal will include material, labor and equipment to construct a playground structure. • Contractor/Vendor shall assume all responsibility for obtaining and verifying measurements. • Contractor/Vendor shall work with City staff to keep disruption of park grounds to a minimum. Trenches or ruts shall be backfilled and tamped by Contractor/Vendor. • Contractor/Vendor must provide safety fencing, minimum 4’ high, around the perimeter of the playground construction area. • Contractor/Vendor must protect and monitor poured concrete footings until it is cured. Contract/Vendor shall be responsible for removal, and replacement, of concrete if vandalized prior to completion of the entire job. • Underground Utility Locations: The contractor is required to call Digger’s Hotline to locate all utilities prior to construction. • City shall be responsible for all connecting sidewalks/trails. • Project must be substantially complete by June 15, 2024. • See site plan for playground location, space restrictions, and contours.