Specifications include, but are not limited to: a. Compliance Requirements (for example, Agency and service specific requirements such as CJIS, HIPAA, Linguistic etc.) b. Construction of a 415’x6’ walkway around right side of Wildlife Pond, installation of a 20 ft. section 12-inch drainpipe to repair/replace existing drainage, construct a 20’x12’ paved pad at the end of walkway. Construction of a 146’x6’ walkway on lefts side of Wildlife Pond, connecting to existing roadway with a 25’x12’ pad at end of walkway. c. The work will include removal of sod and loam to a depth of 6 inches and for a length of the distance from the sidewalk to the road, and from the pavement at the fishing dock to the far side of the pond.