All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The project consists of the reconstruction of 1100 feet of public roadway (Spring Street/Firehouse Road) outside the airport security areas at Bradley International Airport on the east side of the airport property. Work limits connect to several public and private parking areas along with tieins to Light Lane and Ella Grasso Turnpike. The project will consist of reclamation of the existing pavement and placing a new bituminous concrete pavement on the reclaimed base. Drainage improvements will include improvement of the roadway grades and profiles along with full replacement of the closed drainage system within the limits of the project. Concrete curbing is be added to help promote drainage patterns and clearly define driveways. An existing railroad crossing will be rehabilitated as part of the project with the work required to be done by a preapproved railroad subcontractor, a list of approved railroad contractors can be found in Technical Specification Section 02.26. Add Alternate 1 will consist of the rehabilitation of 500 feet of Citation Lane on the same side of the airport as the base project. The project will consist of reclamation of the existing pavement and placing a new bituminous concrete pavement on the reclaimed base. Drainage improvements will include improvements of the roadway grades and profiles along with full replacement of the closed drainage system within the limits of the project. Concrete curbing is be added to help promote drainage patterns and clearly define driveways.