Specifications include, but are not limited to: 1) Roofing –Division 7 A. Remove existing roofing three layers, gutter & leaders on “A” side ridge and shed and dispose of properly. a) Replace degraded sheathing ($90.00 allowance per sheet allowance) b) Photograph any rot damage to sheathing and then any replaced sheets and send to Housing Rehab Specialist before roofing c) Provide and install first two courses with Ice and Water Membrane per GAF requirements (low sloped roofs between 2.12 and 4.12 pitch to be entirely covered with Ice and Water Membrane d) Install new lifetime architectural asphalt shingles manufactured by GAF on pitch greater than 2.12 and GAF Liberty SBS self-adhering cold applied asphalt roofing on low slope roofs less than 2.12 pitch e) Provide and install aluminum “drip” and “rake” edge flashing f) Replace all vents g) Color to be chosen by owner from manufacturers standard pipe and ventilation flashing systems, including but not limited to waste vents, bathroom, range and dryer ventilation h) Install new continuous ridge vent per GAF requirements i) Verify soffit ventilation, install vents as needed j) All work to be performed per building code requirements k) Refer to specifications for all work B. Masonry Chimney Flashing and chimney cap a) Install new chimney cap. b) Replace existing chimney counter flashing with new copper flashing c) Remove Tar and Scarify existing brick masonry d) Install reglet joints and use masonry caulk at joint e) Solder all joints with lead solder f) All work to be performed per building code requirements g) Refer to specifications for all work 2) Gutters A. Remove existing gutters and leaders a) Install new seamless white aluminum ogee style gutters b) Utilize appropriate hangers c) Install new white aluminum leaders d) Connect to existing drains or supply splash blocks accordingly 3) Doors- Division 7 A. Install new A facade entry door (verify size and handing) a) Remove and dispose existing door, jamb and storm b) Located on “c ” façade c) Therma-Tru “ Smooth Star” Energy Star or an approved equal d) Provide similar glass configuration to match existing doors per owner e) Double bore with Reeb On Guard composite jambs f) Provide new Schlage entry door hardware g) $180.00 maximum hardware budget) h) Plymouth, Wakefield, Camelot or Ashcroft collection i) Paint door and jamb as per manufacturers recommendations, including interior and exterior trim, owner to choose color and sheen B. Install new basement entry door (verify size and handing) j) Remove and dispose existing door, jamb and storm k) Located on “c ” façade l) Therma-Tru “ Smooth Star” Energy Star or an approved equal m)Provide similar glass configuration to match existing doors per owner n) Double bore with Reeb On Guard composite jambs o) Provide new Schlage entry door hardware (brass finish) p) $180.00 maximum hardware budget) q) Plymouth, Wakefield, Camelot or Ashcroft collection r) Paint door and jamb as per manufacturers recommendations, including interior and exterior trim, owner to choose color and sheen C. Install (2) new 3-0 x 6-8 storm door at same front and rear entry door a) Larson or an approved equal full view storm door b) Color to be white c) Standard exterior and interior hardware d) Standard fiberglass mesh screen e) Refer to specifications for all work f) All work to be performed to code requirements