Specifications include, but are not limited to: 1. Major HVAC Systems (as applicable) a. Air Handling Units (100%) b. Terminal Units (10% Verification after TAB) c. Supply / Exhaust Fans (100%) d. Fan Coil Units (100%) e. DX Condensing Units (100%) f. Hydronic Pumps (100%) g. Chillers (100%) h. Cooling Towers (100%) i. Boilers (100%) 2. Building Automation System (Point and Sensor Calibration Verification by TAB Firm) a. Graphical Interface according to Design SOO and Owner protocols (100%) b. Major System Control Sequences (100%) c. Packaged Controllers (ie. terminal units) (10% Verification after TAB Control Verification) d. Life Safety Integrations (100%) e. Lighting Control Integrations (100%) 3. Electrical Systems a. Main Switchboard / Breakers (100%) b. Normal / Emergency Power Distribution (100%) c. Emergency Generators / Transfer Switches (100%) d. Lighting – Occupancy Sensors (25% greater than 25 sensors installed, 100% less than 25 sensors installed) e. Lighting – Daylight Controls (100%) f. Lighting – Time Switch Controls (100%) g. Egress Lighting (100%) h. Power Monitoring and Metering (100%)