Specifications include, but are not limited to: Respondent must provide and install a replacement fire alarm system (FAS) at the JPOC 1400 and JPOC 1350 Building to include: Design and permitting with plan review Design drawings (CAD & PDF). The District will provide floor plans in DWG format for use. Electrical work (110v) provided by a licensed contractor working for the awarded vendor Provision of alarm initiating devices and the monitoring of existing waterflow/tamper devices Pull stations at all building exits Duct detectors at all fire/smoke dampers Duct detectors on all AHU’s in accordance with NFPA requirements Ceiling mounted notification devices, where possible The use of existing magnetic door holders where possible The replacement of all damaged and inoperable magnetic door holders All wiring must be plenum rated, concealed above the ceiling, and secured using methods approved by the district Any penetration through a non-rated or rated fire assembly will require proper fire stopping material: Only fire stopping material approved by the District Safety Department will be used to seal penetrations Only trained personnel that have completed Firestop Instructional Training - level 1 or higher will be permitted to install firestop systems All cabling and devices will be labelled Existing conduit will be used where possible in exposed areas A new class A riser will be installed through the building SLC, NAC, Audio, Bus, and all other wiring must be Class A or Class X where possible Program two (2) Potternet Supervising stations including floor plan overlay One at Facilities Engineering One at District PD Dispatch The use of HEPA carts (dust buggies) in compliance with the District infectious control policy Removal and demolition of the existing fire alarm, devices, and wiring once the new FAS is installed, tested, and certified Coordination with all integrated systems vendors for installation and acceptance testing including HVAC, Security, Elevators, ETC Pre-test prior to the final test with the AHJ Acceptance testing with the AHJ As-built documentation must be provided in PDF and CAD formats 8 hours of on-site system training At least a 1-year warranty on all materials and labor from the date of substantial completion Patch and paint All walls where the old audible/visible devices and pull stations are removed will be patched and painted to match. Painting will be blended to match. Painting does not include painting of entire wall areas Stainless steel plates will be provided on walls that have wallpaper or other wall coverings that cannot be painted to match New ceiling tiles (if required) where the old system smoke detectors or speakers are deleted are to be provided by the District and will be installed by the awarded vendor Any areas requiring holes to be cut in sheetrock ceilings for installation of cable above ceilings without existing access hatches will be patched and painted A round white cover plate will be provided for locations where old ceiling mounted devices are deleted in sheetrock ceilings