Specifications include, but are not limited to: The goal of this project is to provide a re-roof solution for two different existing roof assemblies. The first system is a 2-ply modified bitumen asphalt roof over metal deck on the upper roof over the gym area. This will be re-roofed with a recover system. The existing roof will have wrinkles removed prior to additional rigid board insulation being added under a gypsum roof cover board. New two ply SBS modified bitumen roofing system will be installed. The existing low roofs are two different built-up roofs over a tectum deck. The new system on the low roofs will be a new nailed base sheet under rigid board insulation with a gypsum cover board under a new two ply SBS modified bitumen roof system. Existing stainless steel metal copings, gutters, downspouts, and other trim is to remain or be removed and re-installed as required. New stainless steel gravel stop and copings in select areas is included. The metal roof is excluded from this project.