Specifications include, but are not limited to: The Town of Brandon experienced heavy rainfall events during the month of July 2023 which resulted in two instances of the Neshobe River overtopping its bank in the area of the eastern end of Newton Road (Town Highway #21). Damage to the roadway includes loss of asphalt, loss of roadbed at shoulders, and depositing of alluvia from the river into driveway culverts and ditches. Contractors will provide their competitive bid to restore the road and all ancillary infrastructure to pre-event conditions, restoring the road and driveway accesses to specifications of Vermont Agency of Transportation A-76 standard for local roads and specific requirements provided further in this invitation to bid.