Specifications include, but are not limited to: A. The work herein described includes all work by all trades necessary for the schedule of mechanical renovations as described. Mechanical project shall include, 1) the installation of two outdoor AC condensers, 2) the installation of twelve wall mounted heat pump units, and associated refrigeration piping, and 3) providing automatic temperature controls, and associated power/control. Work includes the furnishing of materials and all construction equipment required for the completion of the project with minimal disturbance to the operation of the facility employees and general public. B. The building is presently occupied, thus extreme care is to be taken to ensure safety at all times during both the demolition and installation phases. This includes, but not limited to, installation of proper barricades and close supervision and scheduling of construction activities by Contractor and Owner. C. Scheduling of onsite construction will start as soon as possible after contract signing. Typical normal working hours shall be 8 am to 5 pm during week days. Coordinate with Owner in advance to schedule weekends and after normal working hours.