Specifications include, but are not limited to: SECTION 00210 - MOBILIZATION Comply with Section 00210 of the Standard Specifications. SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC Comply with Section 00220 of the Standard Specifications modified as follows: 00220.02(b) Temporary Pedestrian Accessible Route Plan - Add the following bullet to the end of the bullet list: For an active Work Area controlled at each end by flaggers and pilot car, provide transportation for pedestrians and bicyclists through the active Work Area according to Section 00223 and Section 00228. 00220.03(a) Over-Dimensional Vehicle Restrictions - Replace this subsection, except subsection number and title, with the following: When the Project restricts the width, length, height, or weight of vehicles through a work zone or detours trucks around a work zone, fill out and submit a completed copy of the "Highway Restriction Notice - Size and/or Weight" form (Form No. 734-2357), available from the ODOT Oregon Trucking Online website (see 00110.05(e)), at least 35 Calendar Days before the restriction or detour takes effect. Submit to the Engineer, in writing, when the closure(s) or restriction(s) have ended. 00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following: Traffic Lanes may be closed on I-5 and Harlow Rd over I-5 when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2): Single Lane Closures – One Traffic Lane on I-5 and Harlow Rd over I-5 may be closed during the following times: Nightly, Thursday night through Sunday morning, between 9 p.m. and 5 a.m. One Traffic Lane may be closed on all other adjacent Roadways within the Project Site not listed above, when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2): Daily, Monday through Thursday, between 9:00 a.m. and 4:00 p.m. Friday, between 9:00 a.m. and 3:00 p.m. Nightly, Sunday night through Friday morning, between 6:00 p.m. and 7:00 a.m. Add the following subsection: 00220.41 Bridge Work - Before starting any grading or Pavement removal at Bridge ends or removal of Pavement from Bridge decks, arrange so that all Equipment, labor, and Materials required to complete the Pavement replacement Work and Bridge deck waterproofing Work are on hand or are guaranteed to be delivered. Once grading and Pavement removal begins, vigorously prosecute and complete this Work. Complete paving and membrane waterproofing Work in the shortest possible time. Temporarily taper or bevel longitudinal and transverse grade changes or dropoffs resulting from grading and Pavement removal and membrane waterproofing Work with asphalt concrete mixture to provide a smooth and safe transition. Construct tapers according to 00620.40. 00220.60(a)(1) Contractor Responsibility - In the paragraph that begins "Do the following at no additional…", add the following bullet to the end of the bullet list: During emulsified asphalt chip seal operations, broom the surface being used by bicycles as soon as practicable to keep it free of all dirt, mud, gravel, and other harmful materials. The surface includes bike paths, bike lanes, Roadway Shoulders or the outside 6 feet of the Roadway. SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL Comply with Section 00221 of the Standard Specifications modified as follows: 00221.03 Traffic Safety and Operations - Replace the bullet that begins “When paving operations create…” with the following bullet: When paving operations create an abrupt or sloped edge drop off greater than 1 inch, protect traffic by installing signing according to the "2 Lane, 2 Way Roadway Overlay Area" detail shown on the Standard Drawings. Protect longitudinal and transverse Pavement joints by placing and maintaining an asphalt concrete wedge according to 00221.07(c)(1). 00221.06 (c) Tourist-Oriented Directional and Business Logo Signs Replace this subsection, except for the subsection number and title, with the following: Submit one of the following for approval, at least 5 Calendar Days before the preconstruction conference: (1) No Signs If there are no tourist-oriented directional (TOD) or business logo signs on the Project, a written notification that no TOD or business logo signs exist within the Project limits or (2) Signs Submit one copy of a sketch map of the Project showing all existing TOD and business logo signs and a written narrative describing how these signs will be kept in service and protected throughout all the construction stages. If modifications are necessary, submit updated information to the Engineer for approval at least 21 Calendar Days before the change is needed. 00221.07(c)(1) Paving - Replace this subsection, except subsection number and title, with the following: When the longitudinal joint is greater than 1 inch in height, install additional TCD according to 00221.03. Complete the placing of ACP and construction of paving joints according to 00735.48, 00735.49, 00743.45, 00744.44, 00744.45, 00745.47, and 00745.48, as applicable. 00221.90(b) Temporary Protection and Direction of Traffic Delete the bullet that begins “Moving temporary barrier to and from Contractor’s stockpile areas”. Replace the bullet that begins "When the Schedule of Items does not include …" with the following bullet: Preparing and signing the daily “Traffic Control Inspection Report”, when a TCS is not included in the Schedule of Items or when a TCS is not onsite for a work shift.