Specifications include, but are not limited to: The project construction phase comprises generally of earthwork excavating, regrading, retaining, and recontouring of the campground (as indicated in the Bid Schedule and as shown on Sheets C004-A and C004-B. Asphalt surfacing will only be completed on the areas shown on Sheets C004-A and C004-B of the construction plans. Campsite parking areas, shade shelter concrete pads, tables, and fire rings will only be constructed at the campsites in the event funds are available. The premanufactured CXT restrooms have been relocated and/or delivered and installed by CXT and shall be protected and preserved in place. All remaining proposed facilities and/or improvements will be constructed later under separate contract(s) and construction phase(s).