Specifications include, but are not limited to: 1. The City will arrange for the disconnection of utility service connections. Before starting demolition the contractor shall verify that all utilities have been disconnected. The contractor is responsible for calling dig safe to get locates. 2. The sewer shall be capped. This must be completed by a licensed plumber. 3. Demolish and remove the house and foundation. 4. Demolish and remove the shed and concrete pad. 5. All demolition materials shall be dumped in a demolition landfill licensed by Kansas Department of Health and Environment. 6. Demolition landfill receipts to show landfill usage is required prior to payment for services rendered. 7. Remove concrete, bricks, loose siding, cardboard, construction debris, limbs, branches and wood on ground, loose trash, debris and rubbish from the premises. 8. Remove all cement pads and all interior sidewalks between the City sidewalk and the back of the property. 9. All trees, branches and limbs on the ground, incidental to the demolition of the structures. Trees can only be removed if affecting the demolition of the structure. (Include any tree removal necessary with the bid of the structure) **NOTE if a tree in the City ROW needs to be removed the contractor is responsible for contacting the Code Inspector prior to the removal of the tree. 10.All grass/vegetation shall be cut back below the 12 inches to comply with the City of Topeka ordinance.