Specifications include, but are not limited to: The Contractor shall design, manufacture, test, ship, offload, and reassemble (as required) a prefabricated building with integrated 15kV metal clad switchgear. The building will include elements solely designed by the Contractor.. Elements designed by others include: • Necessary ground/foundation work to support control house including conduits. Elements design by the Contractor include: • Building utility services per EWEB specifications • 15kV switchgear per EWEB specifications • Control integration with design by others The completed building shall be delivered to Danebo Substation and offloaded by the Contractor. The building will be reassembled and retested per EWEB and Contractor standards before being turned over to EWEB for final integration with Danebo Substation.