Specifications include, but are not limited to: Provide materials equipment and labor for Gasoline Fuel Tank Concrete/ Sidewalks for the Kansas Department of Transportation. The vendor shall provide all labor, materials, and equipment required to complete the construct of two concrete structures for the Kansas Department of Transportation (KDOT); one in Newton Ks and one in North Wichita. Construct a concrete pad for a new 4000-gal fuel tank based on the specifications and plans provided by KDOT. – KDOT NEWTON, KS ; Construct a replacement concrete sidewalk and two accessible ramps based on the specifications and plans provided by KDOT. – KDOT Wichita Hillside; • Removal of existing asphalt millings and soil as needed. Millings and excess soil will be placed on site as directed by KDOT. • Excavation, compaction, and placing foundation stabilization (AB-3) • Forming footings, walls, and placing reinforcing steel to the dimensions in the plans • Place the 28 bollards as specified. 6" steel pipe filled with concrete, set in 12" diameter, 3' deep concrete, primed and painted yellow. • Place concrete in formed areas and on grade for the slab to the plan dimensions • Backfill and compaction of soil around the new concrete structure upon proper curing • KDOT representative will set the new slab location and slab elevation. • Foundation Stabilization shall consist of approved AB-3. • Existing subgrade, foundation stabilization shall be compacted to Type B compaction (90% maximum density) and may be determined by the walk-out method or verified by density tests. • 611 of Foundation Stabilization (AB-3) shall be utilized under the concrete slab and is included in the quantity. • Contractor will allow and coordinate with the tank manufacturer to place electrical conduit in the formed area.