Specifications include, but are not limited to: The work of this project will take place in Warrenton, Oregon and will consist of, but is not limited to furnishing all labor, materials, equipment and superintendence necessary for the following: Overlay the listed streets below in with a 2" Asphalt overlay. The work will be accomplished in the summer/fall of 2023. In general, the elements of work include, but are not limited to: 1. Clean street to be overlaid of loose rock, organics, dirt, dust. 2. Grind out areas directed by Engineer. 3. Add tack coat to clean dry street per specifications. 4. Overlay streets with 2" asphalt concrete as specified. Complete digital project bidding documents are available at http://www.questcdn.com.