Specifications include, but are not limited to: The Town of Enfield will be completing a complete renovation and expansion of our Town Offices and Library located in Whitney Hall at 23 Main Street in Enfield NH. We are accepting proposals proposal to conduct a hazardous building material survey (HBMS) for the interior and exterior of the property indicated above (Site) for the purpose of identifying the presence of asbestos-containing materials (ACMs), lead-containing paint (LCP), polychlorinated biphenyls (PCBs) in building materials, and universal waste. Page 2 of 5 The building was built in 1900 and then partially renovated in 1993 and is approximately 8,000 square feet. The purpose of this survey is to provide the City with information related to existing hazardous building materials (HBMs) that may be encountered and/or require abatement/removal and disposal. The proposed scope of work will be completed in accordance with the following state and federal regulations and guidelines: • New Hampshire Env-A A00 Asbestos Management and Control • EPA National Emissions Standards for Asbestos (NESHAP) 40 CFR Part 61, Subpart M • Occupational Safety and Health Administration (OSHA) Lead in Construction Standard • EPA TSCA part 761 regulations for Polychlorinated Biphenyl (PCBs)