Specifications include, but are not limited to: TYNER - McKEE ROAD (US 421) (MP 3.860) FROM 116 FEET SOUTH OF JACOBS LANE EXTENDING NORTH TO 85 FEET NORTH OF CARTER LANE (MP 4.010), A DISTANCE OF 0.15 MILES.GUARDRAIL SYP NO. 11-4324.00. Furnish all equipment, labor, materials, and incidentals for the following work items: (1) Site preparation and erosion control; (2) Guardrail, End Treatments, and Terminal Sections; (3) Delineators for guardrail; (4) Cribbing, Filter Fabric, and Dense Graded Aggregate; (5) Maintain and control traffic; and (6) All other work specified as part of this contract. Erect guardrail to the lines and grades shown on current Standard and Sepia Drawings or as directed by the Engineer by any method approved by the Engineer that allows construction of the guardrail to the true grade without apparent sags. Support cantilevered terminal sections with an additional post.