Specifications include, but are not limited to: In general, work includes replacement of (2) roofs and restorations of (3) roofs. Maintenance High Bay 410 River Avenue, Eugene, Or 97404 5,000 Sq. Ft.; Pretreatment Building 410 River Avenue, Eugene, Or, 97404 1,600 Sq. Ft.; Gas Mixing Building #2 410 River Avenue, Eugene, Or, 97404 750 Sq. Ft.; Centrifuge Building 410 River Avenue, Eugene, Or, 97404 3,200 Sq. Ft; Terry Street Pump Station 5190 Terry Street, Eugene, Or 97402 2,000 Sq. Ft.; 1. Clean the existing membrane of all loose dirt, minerals, debris and organic growth and properly dispose of 2. Cut out and remove all vertical membrane flashings 3. Remove and dispose of any obsolete curbs or penetrations 4. Raise curb heights to allow for 8’’ of flashing height 5. Furnish and install polyisocyanurate crickets between drains to promote positive drainage using mechanical fasteners for attachment 6. Replace all drain bolts, rings, and strainers to match the existing profile 7. Furnish and install ½’’ densdeck coverboard using mechanical fasteners 8. Furnish and install 2-ply SBS modified bitumen assembly using cold-applied adhesive 9. Furnish and install 24-gauge galvanized steel coping cap, counterflashings, and associated accessory flashings