Specifications include, but are not limited to: 1. Properly drain, clean and dispose of the 275-gallon fuel oil aboveground storage tank (AST) located in the Lot 61 garage 2. Properly drain, clean and dispose of the approximate 2,000-gallon AST with unknown contents located outside the Lot 60 garage 3. Pump, clean and dispose of the contents of the concrete holding tank located outside of the Lot 61 garage 4. Properly abate approximately 1,250 square feet of asbestos-containing black wall coating in the Lot 60 garage 5. Demolish and properly dispose of demolition debris and concrete foundations of buildings Lot 60 garage, Lot 60 salt shed, Lot 61 garage, and Lot 61 shed/pole barn. a. Ensure demolition workers are notified of the presence of lead-based paint in accordance with the OSHA Lead in Construction standard. b. Note: due to the presence of lead-based paint on certain building materials, proper waste characterization sampling may be necessary on consolidated demolition debris to receive disposal facility approval. c. Inspect sol beneath the Lot 60 garage. 6. Demolish/remove and dispose of concrete holding tank outside Lot 60 garage and Lot 61 fueling pad 7. Re-grade demolition/removal areas to “make safe” with a minimum 1:2 slope 8. Many areas of Site soils are characteristic of “urban fill” and contain polycyclic aromatic hydrocarbons (PAHs) and/or low level metals; therefore, if any excess soil is generated that requires offsite disposal, the soil should be sample for waste characterization analyses and disposed at an appropriately licensed facility