Specifications include, but are not limited to: providing all materials, equipment, labor, and supervision for the construction of a new process air compressor facility including, site civil work, relocation of underground utilities, abandonment of existing utilities, installing micropiles, construction of a new process air compressor building with an electrical room, installation of 6 process air compressor units, installation of process air piping and controls, demolition of existing process air piping and controls, construction of walk ways and sidewalks, repair to existing building masonry, repair to aeration basin construction joints, installation of site drainage, and paving of a new road. The process air compressor manufacturer and scope of supply have been preselected. Bidders will include the cost of the preselected equipment in their bid as shown on the Bid Form.