Specifications include, but are not limited to: 1. Removing and disposing of two existing boilers. (This is not to include a third nonfunctioning also in the space.) 2. Providing two new boilers and all materials to install the boilers as specified. In addition to the boiler, this is to include providing and installing: a. Alarm on failure option b. Boiler pumps c. Motorized isolation valves and interlock d. Interlock with existing make-up air dampers e. Condensate neutralization kits f. Communications option and integrate to existing energy management – BACnet protocol 1) Interface new boilers into existing Schneider Electric BMS. All control work associated with the new boiler(s) installation shall be performed by SNE Building Systems, East Granby, CT, no exceptions. Please contact Jeff Hammick (860-653-5095) jeff.hammick@snebuildingsystems for control pricing to be included in your bid price.” g. System to control start/stop and firing rate h. Boiler water magnetic strainers 3. Cleaning and flushing hydronic system 4. Testing and treating hydronic system to meet manufacturers specifications 5. All other testing, flushing, etc. per manufacturer’s specifications. 6. Initial testing and firing of boiler. 7. Operator training 8. Follow-up for one year to resolve any issues with new boilers.