Specifications include, but are not limited to: Contractor shall pickup temporary bridge located at 1170 US Rt 2 Middlesex Vermont, the contact will be Sven Scribner (802) 522-8090. The bridge install at Onion River Rd will be an 80 foot single lane bridge, this will require 2 full size tractor trailer loads, or if using a smaller trailer 3-4 loads to be delivered by the contractor. The bridge will sit on waste block abutments, this will require 4 waste blocks. The bridge will require an unpaved approach on each end, the length of the approach will be roughly 30 feet to transition up to top of the temporary bridge deck. The depth of the approach at the bridge will be roughly 3 feet and taper down to the existing grade, the width of the approach will be roughly 17 feet and the travel opening of the bridge is 15 feet. Jersey barriers will be required to help retain the approach fill on the sides and used for channeling the traffic onto the bridge, this will require 10 jersey barriers. Wood required to build a backwall to retain the fill would be 4 sheets of ¾ inch pressure treated plywood, decking screws, and (10) 2X6’s pressure treated. From there an excavator and a loader will be needed to build the bridge on site with technical guidance from the state when the project is started. Debris and rail from the existing bridge shall be removed and the approach areas repaired to pre-storm elevations. Once the approaches are rebuilt and the bridge can be launched it will be launched from the US 2 side using rollers over the existing bridge, VTrans will provide onsite technical guidance throughout the process.