Specifications include, but are not limited to: Project: Three Knolls Phase 1 Location: Project is located southeast of Scipio, Utah. Elevation is 6,100 – 6,800 feet with flat but gently sloping topography. Vicinity maps showing sites are attached. Nearest Airport: Salina-Gunnison Airport is 10 miles from the application area. Acreage: Estimated up to 532 acres Pricing: Bids are to be submitted on a cost per acre basis. Application Rate: Open Range-G® Herbicide is to be applied at 12 lb/acre (or equivalent). The Division of Wildlife Resources (UDWR) will supply the herbicide. GPS Technology: The aircraft must be equipped with a global positioning system that is used to establish flight lines for 100% coverage. UDWR will provide to the Contractor an electronic file containing coordinate positions of treatment areas in an ARC/INFO GIS format. The Contractor shall provide a Trimble, ARC/INFO or ARCVIEW electronic file in UTM projection North America Datum 1983 of treatment coverage upon completion of each treated area or as required by the Contracting Officer. A government representative shall monitor the Contractors GPS to assure Contractors compliance with contract specifications.