Specifications include, but are not limited to: AWWU intends to contract out the hauling of sludge generated at the Eagle River Wastewater Treatment Facility in Eagle River. The Eagle River Facility is located at 15524 Artillery Rd., Eagle River, AK 99577.The sludge hauled from the Eagle River WWTF will be delivered to the John M. Asplund Wastewater Treatment Facility at 2300 Hutson Drive. (Bidders should be aware, that truck traffic is prohibited on W. Northern Lights Blvd. between Turnagain Blvd. and Postmark Drive.) The sludge to be hauled consists primarily of the thickened solids removed during the wastewater treatment process. The sludge will average between 2-12% solids with the remaining portion being water.