Specifications include, but are not limited to: Construct 200 South multi-modal roadway improvements from 270 West to 570 West Road (approximately 0.42 miles). Demolition work includes; demolition of existing asphalt pavement, concrete, utilities, and street signs, etc. New Construction work includes construction/installation of; asphalt pavement, concrete curb and gutter, concrete sidewalk, traffic signage, roadway striping, chain link fencing, storm drain pipe (12” RCP, 24”), storm drain manholes, culinary water pipe (6” PVC, 8” PVC), new fire hydrants, secondary water pipe (1” Service, 1½” Service, 2” Service, 4” PVC, 6” PVC, 8” PVC, 12” PVC) and meters, adjust sanitary sewer manholes, fiber optic utility equipment, and all appurtenances. The Work features a railroad crossing which will require flagging and coordination.