Specifications include, but are not limited to: The Work consists of the construction of a new ER and new TRs throughout the school. Installation of new backbone conduit pathways and cabling for low voltage systems between the new ER and each TR. The existing cabling infrastructure shall be replaced with new cabling for upgraded low voltage systems. Upgrade the Security Camera System, Data Network and Telephone systems, Clock/Intercom system, Intrusion Alarm system, and Classroom Audio Video System for the campus. Portables will transfer from legacy Fire Alarm panel to newer existing one which supports the rest of the school. Additions or alterations made to the fire suppression sprinkler system and fire alarm notification/sensor devices shall only be made to adjust for areas impacted by construction or the establishment of new rooms/spaces as required by code. Add new HVAC only to support new ER and TR spaces. Electrical changes will primarily focus around the new power requirements of the new ER and TRs, including new panels and feeders. New lighting fixtures will be required for the new ER and TR spaces, and any other areas where the ceilings have been impacted by the construction scope. Provide new ceilings where required along new in-ceiling pathways. Demo old low voltage systems’ infrastructure once new systems are online. Demo legacy coaxial cabling and associated splitters, amps, etc. Replace a single HVAC package unit on top of Auxiliary Gym. Demo abandoned HVAC ducts and pipes above ceiling along the proposed route of new backbone conduits to make space for new pathways. Pipes will require limited asbestos abatement.