Specifications include, but are not limited to: A. The scope of this contract may include, but is not limited to, the following capabilities: 1. High pressure washing and abrasive blasting in accordance with MPI paint preparation requirement. 2. Surface preparation and prime painting surfaces using Lead Safe Work Practice requirements of the EPA Renovate, Repair and Paint rule prior to repainting. 3. Surface preparation of substrates as required for acceptance of painting, including cleaning, small crack repair, patching, caulking, re-nailing, and making good surfaces and areas to the limits defined under MPI preparation requirements. 4. Surface preparation and prime painting surfaces for wall coverings prior to installation in accordance with MPI and wall covering manufacturer’s requirements. 5. Specific pre-treatments noted herein or specified in the MPI Architectural Painting Specification Manual. 6. Priming (except where pre-primed with an approved primer) and painting of structural steel, miscellaneous metal, ornamental metal and primed steel equipment. 7. Priming and back-priming of wood materials as noted herein or specified in the MPI Architectural Painting Specification Manual. 8. Painting of all semi-concealed areas (e.g., inside of light troughs and valances, behind grilles, and projecting edges above and below sight lines). 9. Painting and finishing of all exposed to view elevator equipment and components (i.e. doors and door frames) unless pre-finished. 10. Painting of exposed to view mechanical (heating, ventilating, and plumbing) services and equipment, e.g., ducts, sprinkler piping, etc., and electrical work to extent noted on Finish Schedule unless pre-finished. 11. Re-painting of existing surfaces and finishes when adjacent to new painting work where applicable including surface preparation, prime and finish coats in accordance with MPI Repainting requirements. 12. Provision of safe and adequate ventilation as required over and above temporary ventilation supplied by others, where toxic and/or volatile / flammable materials are being used.